Skip to main content

Casino Club at the Greenbrier

Overview

The Casino Club at the Greenbrier features an elegant Monte Carlo-style casino, as well as high-end retail shops, three dining areas, and a lounge. The new complex is discreetly located 35 ft underground, beneath the redesigned front entrance green space. The expanded project includes a 9,000 SF historical renovation of the hotel’s adjoining lower lobby, front desk support spaces, and a new entry vestibule and porte cochere. Clancy & Theys completed the entire project while the hotel remained open to accommodate guests.

The project features high-fidelity audio and high-definition video distribution systems engineered to exceed the typical performance capabilities found in similar facilities. Consistent with the high-end architectural design elements, the audio and video components are professionally integrated into the space. Various audio and video sources can be delivered to any desired facility area. High-quality, compact professional audio systems can support live music performances in several locations and can be distributed throughout the entire facility when desired.

The Casino Club project truly was a technological marvel, from construction methods to systems implemented and used, all the while not disturbing the property. Not only was it completed in record time, but it also represents a level of technology and creative construction methods for successful completion.

Project Details
Client: The Greenbrier
Location: White Sulphur Springs, WV
Architect: Shope Reno Wharton Architecture
Size: 102,000 SF
Key Engineers:
Draper Aden Associates
Innovative Engineering Services
Share this project:
As the Architect of the Greenbrier Resort’s Casino Club Project, I was impressed throughout the course of the project with the discipline, professionalism and teamwork that they demonstrated from preconstruction services all the way through closeout and beyond. The project was substantial; approximately 100,000 sq ft of underground construction attached to the existing 130-year-old Greenbrier Hotel building via new underground staircases and elevators, and it was built on a fast track in nine months. The project’s expedited schedule and high level of finish quality were only made possible by the management of the process that Clancy & Theys provided.
Michael Oliver McClung | Partner | Shope Reno Wharton Associates