Skip to main content

Churchill Hall Office Building

Overview

Clancy & Theys Construction Company provided construction management for Churchill Hall Office Building while overseeing the design project. This project includes approximately 31,000 square foot per floor and four parking spaces per 1,000 square foot leased. The building utilizes spread footings with a concrete slab foundation, a conventional steel structure with elevated composite concrete slabs, and a TPO roof. This project also features an intelligent glass system called View Dynamic Glass. View Dynamic Glass is a smart window that maximizes natural light and unobstructed views while reducing heat and glare. Unlike traditional glass, View Dynamic Glass tints in response to outdoor conditions providing greater comfort and energy efficiency without ever compromising the view. It is powered by a sophisticated intelligence engine that adapts to the environment and automatically responds to outdoor conditions and tenant’s preferences, or it can be controlled individually from a mobile device. It adjusts throughout the day to optimize the indoor climate and the outside view, creating more comfortable, productive, and energy efficient interiors that help employees thrive.

The facility is seeking LEED Silver certification.

This is the ninth office building Clancy & Theys has constructed in the Imperial Center business park.

Project Details
Client: Tri Properties
Location: Durham, North Carolina
Size: 150,000 Sq Ft
Share this project: