Overview
Clancy & Theys Construction Company signed a design-build contract for the 1,000,000 SF distribution center with approximately 15,000 SF of office and maintenance areas. The structure of the building is a concrete slab on grade, with conventional steel framing, and concrete tilt wall panels. The exterior is completely painted with a textured elastomeric coating. There is a separate fire pump house, equipped with two fire pumps, and guard house to support the facility. The distribution center’s peak is 45’-0” clear with a minimum of 37’-0” clear around the perimeter for the internal Racking and Conveyor systems. ESFR sprinkler system. The project was completed on a fast-tracked, 10-month schedule.
Project Details
Client:
Dollar Tree, Inc.
Location: Windsor, Connecticut
Architect:
HBA Architecture & Interior Design
Size: 1,000,000 SF