The new 1,000,000 SF distribution center in Rosenberg, Texas, includes 73 receiving docks and 40 shipping docks. Nearly 2M of concrete was poured in five months, which included the building slab on grade and the first ever Dollar Tree truck concrete parking lot—a decision that was made due to the Texas heat. In just 10 ½ months, we went from the first bucket in the ground to a fully operational distribution center receiving product to serve Dollar Tree retail stores throughout Texas, which is home to nearly 10% of all Dollar Tree’s retail stores. Our design-build team delivered this project on time and under budget—a true testament to the benefit of a collaborative design-build approach and the expertise of our team.

Since the completion of the original building, our team has returned for additional projects. We recently designed and built a 22,000 SF mezzanine on top of the existing mezzanine with an operational sortation system underneath. All steel members had to be installed during the third shift from Friday to Monday. We worked extensively with the operations team to schedule this work while keeping the existing equipment functioning.

Our team also assisted local and state authorities with constructability topics.

Project Details
Client: Dollar Tree, Inc.
Location: Rosenberg, TX
Architect: HBA Architecture & Interior Design
Size: 1,000,000 SF
Key Engineers:
RTB Engineering
Kimley-Horn
Sigma Psi Consulting